View Video

Amey

“The most significant improvement has been in the efficiency and ease with which we now report and monitor exposure”.

 

Date: October 2008

Site: Local Government and Highways Agency Contracts

Action:

Amey ran a prototype system for over a month alongside a reasonably organised paper-based system which prompted them to roll out.

Result:

Increased productivity as Amey found that operatives had been overestimating trigger time by up to 10 times with the paper based system. The HAVmeter® is now being used on over 9 major contracts across the UK and Northern Ireland.

Testimonial:

Interlink M74 Project - David Teasdale, Site Foreman

“I couldn’t believe the HAVmeter could survive those conditions. When we saw it slip into a flooded cavity, we thought we’d never see it again. However, when we found it again two months later, we just took it out, wiped it down, and carried on using it. It is a very impressive and resilient piece of technology.”