“The most significant improvement has been in the efficiency and ease with which we now report and monitor exposure”
|
Date: |
October 2008 |
|
Site: |
Local Government and Highways Agency Contracts |
|
Action: |
Amey ran a prototype system for over a month alongside a reasonably organised paper-based system which prompted them to roll out. |
|
Result: |
Increased productivity as Amey found that operatives had been overestimating trigger time by up to 10 times with the paper based system. The HAVmeter® is now being used on over 9 major contracts across the UK and Northern Ireland. |